Design-Build Services
One contract, one team, one point of accountability. Toronique's design-build approach connects your architect's vision to construction reality under a single, guaranteed scope.

From Concept to Completion Under One Roof
The traditional approach to building or renovating a home separates design from construction. You hire an architect, finalize plans, then find a builder, and hope the two can work together. That disconnect is where budgets blow up, timelines stretch, and miscommunication takes root.
Toronique's design-build model eliminates that gap. We get involved at the earliest stage of your project, working alongside your architect or designer to review plans for buildability, cost efficiency, and alignment with real-world construction conditions. By the time plans are finalized, we've already identified potential issues, priced the project accurately, and locked in a guaranteed delivery timeline.
The result is a faster, more predictable process. You deal with one team from the first design meeting through final inspection. There's no blame-shifting between architect and builder. No surprise costs because the design assumed materials or methods that don't align with the budget. Just a coordinated path from concept to keys.
What Our Design-Build Process Covers
Pre-Construction Planning & Feasibility
Before any plans are drawn, we assess your property, your goals, and your budget to determine what's realistically achievable. This includes reviewing zoning restrictions, lot conditions, and municipal requirements so the design process starts with constraints clearly defined, not discovered halfway through construction.
Design Coordination with Your Architect
We work directly with your architect or designer throughout the planning phase. Our role is to provide construction-side input: material pricing, structural feasibility, trade coordination, and value engineering. If you don't yet have a designer, we can recommend architects we've collaborated with successfully on past Toronto projects.
Permitting & Approvals
We manage the full permitting process, from preparing drawings and documentation for City of Toronto submission to coordinating inspections and handling Committee of Adjustment applications when variances are needed. Having the builder involved in this stage prevents permit delays caused by designs that don't align with what's buildable or approvable.
Construction & Project Delivery
Once permits are in hand, construction moves forward under the same team that helped shape the design. Every trade, every material order, and every schedule milestone is managed by your dedicated project manager. The scope, price, and timeline were locked in during the design phase, so construction proceeds without the renegotiations and change orders that plague the traditional model.


Why Design-Build with Toronique
Builder Insight from Day One
Most architects design without real-time input from the builder. That often produces plans that are beautiful on paper but expensive or impractical to construct. When Toronique is at the table from the start, we flag issues before they become costly revisions: structural approaches that simplify framing, material selections that reduce lead times, layout choices that make HVAC and plumbing more efficient. The design gets better because it's informed by two decades of building experience.
Your Architect Stays Independent
Unlike firms that employ in-house designers, we work with your chosen architect. That means your designer's loyalty is to your vision, not to our margins. We believe the best results come from an architect who advocates for the homeowner and a builder who brings the expertise to make those ideas buildable and affordable. It's a collaborative model, not a captive one.
Guaranteed Scope Before Construction Starts
Because we're involved through the entire design phase, our pricing is based on complete information, not assumptions. By the time you sign the construction contract, the design is resolved, the materials are specified, and the price is guaranteed. No allowances that turn into overages. No vague line items that grow during the build.
Projects Delivered Through Our Design-Build Process
These projects were managed from early design coordination through construction and handover, demonstrating the efficiency and quality of an integrated approach.
New Build
Custom Home
2025
9 Salonica Avenue

New Build
Multiplex
2026
560 Atlas Avenue

New Build
Multiplex
2025
171 Cedric Avenue

New Build
Custom Home
32 Saintfield Avenue

New Build
Landscape Design & Build
2025
56 Misty Crescent

Landscape Design & Build
2024
39 Denlow Boulevard

Frequently Asked Questions
In the traditional model, you hire a designer and a builder separately. The designer creates plans, then you bid the project out to contractors. This often leads to misalignment between the design and the budget. In a design-build model, the builder is involved from the design stage, providing cost input and construction expertise throughout. The result is a more accurate budget, a faster timeline, and fewer surprises during construction.
No, and that’s intentional. We work with your architect or designer so they remain an independent advocate for your vision. Our role is to bring construction expertise into the design process: reviewing plans for buildability, advising on materials and costs, and ensuring the design is achievable within your budget and timeline. If you need an architect recommendation, we’re happy to connect you with professionals we’ve collaborated with in Toronto.
It’s typically less expensive overall. The traditional approach often results in redesigns when the builder’s pricing comes back higher than the architect anticipated. Those revisions cost time and money. With design-build, the budget is grounded in real construction costs from the beginning, which means fewer change orders, less rework, and a more predictable total cost.
Design-build works well for any project where the scope, budget, and timeline need to be tightly controlled. Custom homes, full-home renovations, major additions, and complex multi-phase projects all benefit significantly. Even smaller projects gain from early builder involvement, though the cost savings are most pronounced on larger, more complex builds.
